Parkland Ranches Roadway Enhancements

PLEASE NOTE:

Trotters Lane from 87th Avenue to 82nd Avenue is now a one way road (West to East).

Project Overview

Parkland RanchesThe City of Parkland has hired Bergeron Land Development (BLD) to improve the drainage and resurface the roadways in the Ranches neighborhood of Parkland.

BLD will dredge the roadside canals to remove sediment to improve water flow and reduce the risk of flooding. We will also clear and grub the canal banks of vegetation to improve drainage and prevent obstruction.  Damaged or outdated culverts will be replaced to enhance stormwater management. The canal banks will be restored with Earthwork and sod to prevent erosion and provide long-term durability. The current stormwater system will be upgraded with a new outfall structure and two stormwater pumps to improve the neighborhood’s flood control.

The existing road surfaces will be milled and resurfaced, which may also include reworking the existing road base. BLD will adjust the roadway cross slopes to enhance drainage and improve safety. Where needed, driveways will be partially reconstructed to harmonize with the new road surfaces, new guardrails will be installed, along with new signage and pavement markings.

BLD will convert a portion of Trotters Lane / NW 72 Street to a one-way road, and blue raised pavement markers (RPMs) will be installed to mark fire hydrant locations.

Work began in January 2025 and is expected to be completed by the end of 2026.

Project Updates

For the week of September 28, 2026, Bergeron Land Development will continue:
  • Driveway harmonization, base work and shoulder work on NW 72nd Street/Trotters Lane
As of September 25, 2026, Bergeron Land Development has:
  • Completed roadway and shoulder work and finished sodding on 87th Avenue.
  • Begun roadway work on NW 72nd Street/Trotters Lane

Questions or Comments

Questions

Thank you for visiting our website. Please check back each week for project updates.